Update: More Hearthwood Goings-on

Ron from Rising Sun Construction has begun work on the drainfield yesterday! AND our light fixtures (interior) arrived from the catalogue as well.
Today Jean met with Hooks Plumbing on site to go over some more details. She is now down at IKEA, buying our kitchen sink and solid wood countertops! Hussah!

Wiring, Weekend Three

This past weekend we nearly finished all the electric wiring for the dome!
Saturday, I was pretty good about getting out to Hearthwood at a reasonable time. Dad, Bob and Kathy all helped to get the remaining wires put in the first floor, and move on to the basement.
We also began assembling our tub/shower unit, but noticed it had developed a small crack in the bottom and so decided to move it back to the basement and purchase a stand-alone tub for the first floor.

Continue reading “Wiring, Weekend Three”

Silt Fence and Wiring

This weekend was really more than we could have hoped for. Not only did we manage to get the silt fence up, which I thought would have taken the whole weekend, but we also nearly finished wiring the top two floors!
Saturday morning, My Mom, Dad, Bob and Kathy all came out to help put up the super silt fence and regular silt fence. If you haven’t seen the stuff, super silt fence is made up of 4″ diameter poles, chain link fence and a plastic mesh laid on the chain link.
Last fall we only get so far as putting in three fence posts, since the ground was so hard.

Continue reading “Silt Fence and Wiring”